## Key takeaways

- Measure stop duration and recovery time by cause and outlet.
- Match the grader configuration to total flow and grade distribution.
- Keep rejected and temporarily held product visibly separated.
- Accept the line against recorded crop, bag and restart conditions.

## Find the real stop before changing equipment

A potato bagging line can appear to have a capacity problem when the actual restriction is a sequence of short interruptions. A worker may pause inspection because too much product arrives at once, a full bag may wait for removal, or one grade outlet may fill while other outlets remain available. These events reduce the useful operating time even when the machines continue running between stops.

Begin with an observation sheet covering at least one representative operating period. Record the clock time, incoming condition, approximate feed state, number of active outlets, reason for each stop, stop duration, time to regain a steady flow, and whether product accumulated upstream. Record filled bags by outlet as a count, while recording mass separately if a scale is available. This separates a bag handling delay from a true mass flow restriction and gives the trial a traceable basis.

- Record stop cause and duration rather than only total downtime.
- Count filled bags by outlet and record bag mass as a separate field.
- Mark whether the rejected stream stayed separate from accepted product.

## Give manual inspection enough attention capacity

The inspection stage works through human attention as well as mechanical movement. The selection platform uses chain-driven stainless rollers to rotate each potato through 360 degrees while workers remove bad potatoes to a central waste channel. If the incoming layer becomes too dense for the available attention, defects can be missed or workers can slow the line. If the flow is too light, the downstream equipment may be underused without improving the inspection decision.

The operating target should therefore be expressed as a stable feed condition that the inspection team can examine consistently. During a trial, compare the same crop stream at two deliberately different feed conditions and record the number of workers, visible accumulation, removed material and downstream interruptions. This is a commissioning observation, not a guaranteed installed performance figure. The acceptance record should describe the sample and inspection method so that the result remains meaningful when crop size or condition changes.

- Note worker count and position for every trial condition.
- Record accumulation at the inspection surface and transfer points.
- Keep removed material in the designated waste path throughout the observation.

[![Potato selection platform with chain-driven rollers and accessible inspection surface.](https://www.spudmate.com/wp-content/uploads/2026/10/spudmate-potato-selection-platform-1024x512.jpg)](https://www.spudmate.com/products/potato-selection-platform/)

Potato selection platform for manual inspection before grading and packing.

## Distribute flow by grade before it reaches the bags

The mechanical grader uses bilateral variable-pitch stainless pipes. The gap increases along the machine, allowing different potato sizes to fall to different outlets. This creates a distribution problem: the total incoming rate may be acceptable while one grade receives a much larger share than the others. The bagging stage then experiences a local bottleneck at that outlet, even though unused capacity remains elsewhere.

Plan the downstream arrangement around active grade outputs and their expected share of the crop. A three-level arrangement and a four-level arrangement create different outlet counts, so the number of bag positions, operators and collection points must follow the selected configuration. Do not use the overall machine rating as the expected rate for every grade. Measure the mass or bag count from each outlet during a trial and compare it with the intended product mix.

- List the expected grade shares before selecting outlet handling.
- Check every outlet separately during the material trial.
- Identify any grade that routinely waits for bags or operator attention.

[![Potato mechanical sorting machine with longitudinal grading section and multiple outlet positions.](https://www.spudmate.com/wp-content/uploads/2026/10/spudmate-potato-mechanical-sorting-machine-small-1024x512.jpg)](https://www.spudmate.com/products/potato-mechanical-sorting-machine-small/)

Potato mechanical sorting machine for separating potatoes by size before packing.

## Treat bag changes as a controlled recovery event

The bagging machine uses a flat belt and partitions to direct potatoes to separate outlets. Each outlet can open or close independently while conveying continues, so a full bag or a bag change at one outlet does not automatically require every outlet to stop. The practical benefit depends on how quickly the operator can close the affected outlet, remove the bag, position the replacement and reopen the outlet without creating an accumulation that later reaches the transfer.

Measure the complete change cycle rather than only the time when an outlet is closed. Record the outlet number, bag condition, closure time, replacement time, reopening time and recovery time to a stable stream. If a grade has no alternate active outlet, note where that product waits and how it is controlled. The trial should also show whether product from a temporarily closed outlet is diverted, held or allowed to accumulate; do not assume an unrecorded buffer or automatic weighing function.

- Time closure, replacement, reopening and flow recovery as separate events.
- Check whether other outlets continue conveying during the change.
- Record where product waits when one outlet is unavailable.

[![Potato bagging machine with partitioned conveying section and separate outlet positions.](https://www.spudmate.com/wp-content/uploads/2026/10/spudmate-potato-bagging-machine-1024x512.jpg)](https://www.spudmate.com/products/potato-bagging-machine/)

Potato bagging machine for automatic filling after grading.

## Prevent rejected product from silently rejoining

Manual inspection and grade separation create different product paths, and both need a visible destination. The inspection platform sends removed potatoes to a central waste channel. That channel must remain identifiable during operation so removed material does not mix back into the accepted stream at a transfer or during clearing. A rejected grade from the sizing stage also needs its own identified route if it is not intended for the same bagging decision.

During commissioning, trace a small marked or otherwise identifiable sample through each decision point and observe the final destination. Record where accepted, rejected and temporarily held material travels. If the line stops, repeat the check after restart because an accumulation can change the path at the first release. The acceptance method should state the separation rule and the observation points; it should not rely on a general statement that the line is running.

- Label each accepted, rejected and held destination on the observation sheet.
- Trace material after both a normal run and a restart.
- Record any manual return and require it to be identified in the trial record.

1. Inspect and remove rejects
2. Separate by grade
3. Control active outlets
4. Record stop and recovery

Conceptual workflow showing how inspection, grading, outlet use and stop recovery are evaluated; it is not a machine layout or scale drawing.

## Choose the configuration from flow distribution and space

The relevant selection is a coordinated choice among inspection width, grading arrangement and bag outlet handling. The inspection platform is rated at 5-15 t/h, while the small mechanical grader is available at 3-5 t/h or 8-10 t/h according to configuration. The bagging machine is rated at 5-15 t/h, but these figures describe separate equipment ratings. They do not establish a guaranteed line rate when crop distribution, operator attention and bag changes are included.

Use the lower practical rate of the constrained hand-off as the starting point, then test how the line behaves at the intended grade mix. For example, an illustrative calculation could assume 600 kg of one grade divided into 30 kg bags: the result is 20 bag operations. That count describes handling events for the example; it does not convert the equipment into a guaranteed throughput or define a weighing function. A real acceptance trial must use the buyer’s actual bag size, grade share and operating sequence.

- Select the grader configuration from total flow and grade distribution together.
- Check adjustable heights and clearances against the proposed layout.
- Treat example bag counts as handling information, not rated output.

| Equipment | Listed capacity | Verified power and voltage | Meaning for configuration |
| --- | --- | --- | --- |
| Selection platform | 5-15 t/h | 0.8 kW; 220 V | The documented role is manual potato inspection before grading and packing; inspection attention still needs to be observed. |
| Mechanical sorting machine | 3-5 t/h or 8-10 t/h according to configuration | 1.7 kW three-level; 2.1 kW four-level; 220 V | The capacity depends on the selected three-level or four-level configuration, so grade outlet planning must follow that choice. |
| Bagging machine | 5-15 t/h | 0.4 kW short version; 0.75 kW long version; 220 V | The documented role is automatic potato bag filling after grading; outlet change timing remains an operating consideration. |

## Use a stop and restart trial that can be accepted

A useful trial has a defined sample, a defined operating condition and a defined record. Start with an empty-machine check of outlet positions and access, then run a controlled material sample through inspection, grading and bagging. Record the feed condition, configuration, active outlets, bag count, separate mass readings where available, stop causes, bag change cycle and reject destinations. Repeat the observation after a deliberate short stop and restart.

Acceptance should compare the recorded behavior with the project requirement: stable transfer, manageable inspection attention, correct grade destinations, controlled bag changes and no unrecorded return of rejected material. Agree how many observations are needed and how crop variation will be treated before the trial begins. Our [potato packing and dispatch conveyor guide](https://www.spudmate.com/potato-packing-dispatch-bagging-conveyors/) provides related planning context, while [small batch potato grading guidance](https://www.spudmate.com/small-batch-potato-grading-3-10-tph/) explains why the grading range must be read by configuration.

- Define the sample and target grade mix before loading product.
- Repeat at least one stop and restart under material flow.
- Sign off measured observations, unresolved limits and the operating condition used.

| Event to record | Useful measurement | What the result can show | Action during review |
| --- | --- | --- | --- |
| Inspection overload | Stop duration, accumulation and worker count | Whether attention or incoming presentation limits stable flow | Reduce the trial feed condition or review the inspection arrangement |
| Grade outlet imbalance | Bags or mass by outlet over the same period | Whether one grade creates a local downstream bottleneck | Review grade distribution, outlet allocation and bag handling |
| Bag change | Closure, replacement, reopening and recovery times | How much productive time each outlet loses | Compare outlet-specific delay with the planned operating rhythm |
| Restart release | First stable flow time and destination check | Whether held or rejected material enters the wrong path | Repeat the trace and document the controlled release method |
| Rejected stream | Destination before, during and after stop | Whether rejection remains visibly separated | Record the path as an acceptance condition |

## Prepare the line around the buyer’s actual operating brief

Before we recommend an arrangement, we need the crop size range, condition, intended grade split, bag size, target operating period, expected number of active outlets and available working space. The brief should also state whether product is manually inspected before grading, which streams are accepted, and how rejected material is handled. These inputs determine whether the observed bottleneck is a machine rating issue or a coordination issue between people, outlets and changeovers.

Use the [potato selection platform](https://www.spudmate.com/products/potato-selection-platform/) for the documented manual inspection role, the [small mechanical potato sorting machine](https://www.spudmate.com/products/potato-mechanical-sorting-machine-small/) for configuration-specific grade separation, and the [potato bagging machine](https://www.spudmate.com/products/potato-bagging-machine/) for automatic filling after grading. We can review the project through the [solutions overview](https://www.spudmate.com/#solutions) and arrange a trial discussion through [our project contact page](https://www.spudmate.com/#contact).

- Send crop samples or representative crop information with the operating brief.
- State bag size, grade mix, active outlets and desired operating period.
- Include layout, voltage and the proposed acceptance observations.

## Send the operating conditions for a stop and restart review

Share representative crop information or samples, target flow, grade distribution, bag size, active outlet count, expected stop pattern, available space and voltage through our [potato bagging line project contact page](https://www.spudmate.com/#contact). We can use those inputs to review the configuration and propose a measurable trial method.