# Potato Water Wash Utility Checklist: Supply, Drainage and Site Interfaces

## Key takeaways

- Measure water delivery at equipment connections under expected concurrent demand.
- Plan drainage and solids removal together, with accessible collection routes.
- Use a selected-component electrical schedule to define the site supply.
- Accept line capacity only within a recorded crop and utility operating envelope.

## Define the operating case before sizing utilities

A potato washing line needs coordinated water supply, drainage, floor levels, access, electrical connections and discharge destinations. Start with crop condition, feed pattern, target output and shift duration. Identify where potatoes, impurities and wastewater will go. Each interface must support the planned operating combinations, not merely work on its own. Include responsibilities for site connections and the information still needed before equipment selection. Turn this brief into an interface checklist with an owner for each item: the equipment supplier, site designer, utility provider or operating team. Distinguish a requested production target from a capacity confirmed for the selected configuration. Resolve missing information before committing to permanent site works.

The [potato water-washing sorting solution](https://www.spudmate.com/products/potato-water-washing-sorting-solution/) covers outbound washing, sorting, grading and bagging. Its approximate line length is 45 m, not a complete building footprint or a utility-sizing rule. Water supply, utilities, layout and final capacity are configured for each project. Confirm the selected arrangement before reserving floor space or fixing connections.

[![Equipment for a potato water-washing and sorting line.](https://www.spudmate.com/wp-content/uploads/2026/10/spudmate-potato-water-washing-sorting-solution-1024x512.jpg)](https://www.spudmate.com/products/potato-water-washing-sorting-solution/)

Water-washing sorting solution for outbound washing, sorting, grading and bagging.

## Check water availability while the process is running

Identify the water source and proposed connection, then measure delivery under expected competing site demand. Pipe size alone does not establish available flow or pressure: distance, elevation and restrictions also matter. Record measurement locations and conditions so the equipment designer can compare them with project requirements. Include supply interruptions and seasonal constraints that could affect the intended operating schedule.

Request a water schedule separating initial filling, operating demand and cleanup where applicable. Establish which activities overlap before sizing the supply. Reuse, treatment and storage are separate engineering decisions, not established features of this solution. Check delivery at the equipment connections; a satisfactory measurement at the building entrance may not represent conditions farther along the distribution system. Use consistent units in the schedule, distinguishing flow rates from volumes required for a particular activity. Record whether measurements represent a brief reading or a sustained observation. Ask the project designer to identify the conditions under which reduced availability requires an operating change, rather than assuming uninterrupted production.

1. Define crop and operating demand
2. Map utility and discharge interfaces
3. Test concurrent operating conditions
4. Accept the configured operating envelope

Conceptual workflow for utility planning and acceptance; it does not represent machine layout or scale.

## Give wastewater and separated solids defined destinations

Map each liquid discharge to its receiving route, including cleanup water. Confirm the wastewater destination and any local discharge conditions with the responsible site authority. Soil and crop fragments can settle where flow slows. Define collection points, removal methods and access, and establish whether solids removal interrupts production. Review any proposed screening or settlement arrangement as part of the site design. Keep liquid routes distinct from the handling plan for collected solids, even if both ultimately leave through the same service area. Check who empties collection points and where the removed material goes. An accessible drain is not a complete disposal plan if its receiving destination becomes unavailable during the shift.

The [BQX potato cleaning machine](https://www.spudmate.com/products/potato-cleaning-machine-bqx/) receives bulk potatoes and feeds a hydraulic cleaning roller. Soft PU spiral blades, adjustable roller spacing and a double-layer impurity conveyor support cleaning and separation. Provide a destination for that impurity stream. These features do not specify water demand or drain capacity; evaluate those interfaces with representative dirty crop.

[![BQX bulk potato cleaning and impurity-separation machine.](https://www.spudmate.com/wp-content/uploads/2026/10/spudmate-potato-cleaning-machine-bqx-1024x512.jpg)](https://www.spudmate.com/products/potato-cleaning-machine-bqx/)

BQX cleaning machine for bulk receiving, soil removal and impurity separation.

## Coordinate floor slope with equipment levels and access

Survey equipment positions, drain inverts, thresholds and the discharge connection. The floor designer should establish falls that direct expected water toward collection points while meeting equipment support requirements. There is no universal slope derived from the approximate 45 m line length. Low spots, foundations and crossings can obstruct drainage even where the overall floor appears to fall correctly.

Reserve space around selected components for operation, inspection, cleaning and removal of serviceable parts. Draw solids-removal and filled-bag routes, then check their intersections with wet areas and maintenance access. A line can fit geometrically yet obstruct essential work. Review these routes with production and maintenance teams before fixing foundations, drains or utility connections.

## Separate component ratings from the line electrical schedule

Individual product ratings are not a complete washing-line electrical schedule. Obtain supply requirements, connection points and operating combinations for every selected component. A qualified local electrical professional should design the supply and distribution for the site. Nameplate kW describes power, not energy consumption in kWh. Agree stopping, restarting and stage coordination separately; motor ratings do not establish control functions.

The [potato bagging machine](https://www.spudmate.com/products/potato-bagging-machine/) has short and long versions and a capacity range of 5-15 t/h. Its flat belt and partitions direct potatoes to independently controlled outlets while conveying continues. This does not establish weighing or sealing functions. Higher receiving-machine ratings cannot establish packed line output. When reviewing [potato processing solutions](https://www.spudmate.com/#solutions), compare the intended washing, grading and packing duties with the destinations and utilities available at your site. Select the process arrangement first, then confirm its interfaces and project-specific capacity rather than choosing it from a single component rating.

| Equipment | Capacity | Electrical or layout specification | Planning decision |
| --- | --- | --- | --- |
| Water-washing sorting solution | Project-configured | Approximate line length: 45 m | Confirm layout, utilities and total line capacity for the selected configuration. |
| BQX-16 | 40 t/h | 7.5 kW; AC 380 V, 50 Hz | Component rating only; include the selected model in the electrical schedule. |
| BQX-20 | 60 t/h | 11 kW; AC 380 V, 50 Hz | Component rating only; do not transfer it to the assembled line. |
| BQX-24 | >90 t/h | 15 kW; AC 380 V, 50 Hz | Component rating only; downstream stages require separate confirmation. |
| Potato bagging machine | 5-15 t/h | Short: 0.4 kW; long: 0.75 kW; 220 V | Confirm version and packing duty; the range is not assigned separately by version. |

## Choose discharge arrangements around available destinations

List destinations for saleable grades, manual removals, impurities and wastewater. For each, identify available receiving space or capacity and who keeps it available. Include bag replacement and filled-bag removal where bagging is selected. Independent outlet operation does not provide unlimited storage or justify continued feeding into a blocked destination. Define the response before production begins.

The most restrictive sustained interface should guide configuration and scheduling. Adequate water delivery does not resolve limited wastewater reception during cleanup; adequate drainage does not resolve blocked packing access. Agree when feed must be reduced or stopped. Any buffer, diversion or coordinated control arrangement requires project-specific design rather than an assumption that it comes with the line.

[![Belt conveyor assembly for potato bag filling.](https://www.spudmate.com/wp-content/uploads/2026/10/spudmate-potato-bagging-machine-1024x512.jpg)](https://www.spudmate.com/products/potato-bagging-machine/)

Potato bagging machine with separately controlled outlets; short and long versions are available.

## Run a trial that exposes competing utility demands

Use defined crop lots, an agreed feed schedule and measurable criteria for each interface. Include representative size and soil conditions within the intended operating range. Record water delivery, drainage, solids removal and discharge availability over a stated duration. Check startup, shutdown and sustained operation. The [water-washing line guide to cleaning, lifting and inspection](https://www.spudmate.com/water-wash-potato-line-cleaning-lifting-inspection/) helps identify the process transfers to include.

Change one relevant condition at a time where practical. Compare water delivery with and without expected competing demand, and observe drainage as solids accumulate. Record pooling locations and whether water clears through the intended route. Test destination interruptions using an agreed procedure. Assess cleanup separately and with production only where that overlap forms part of the planned schedule.

| Observed condition | Check | Decision |
| --- | --- | --- |
| Water delivery falls under competing demand | Compare connection flow and pressure with and without that demand. | Review distribution or operating overlap. |
| Drainage slows during the trial | Compare drainage and solids accumulation early and late. | Review solids collection, removal and access. |
| Water remains near a support or threshold | Compare pooling with surveyed levels and drain routes. | Review local floor geometry and obstructions. |
| Potatoes accumulate at an unavailable destination | Record the upstream response during an agreed interruption test. | Define feed coordination and destination requirements. |
| Cleanup produces greater discharge | Observe cleanup and any planned production overlap. | Review wastewater reception and scheduling. |

## Accept a defined operating envelope and record its limits

Write acceptance criteria before testing, including measurement locations, observation periods and responses to failed checks. Cover configured water requirements, expected discharges, accessible solids removal and transfer to available destinations. Agree thresholds with the responsible designers and operators. Inspecting an empty line cannot demonstrate performance with crop loading, suspended solids or competing utility demand. Assign someone to record each observation and distinguish equipment behavior from a site restriction, such as an unavailable receiving route. If a check fails, document the condition, the corrective action and the scope of any repeat trial. This makes acceptance a usable handover document rather than a single pass-or-fail statement.

Keep a trial log identifying crop condition, feed rate, concurrent utility use, selected components and restrictions. Confirm component and total line capacities for that configuration, then evaluate operation against the agreed criteria. Reassess affected interfaces when soil loading, production hours, water availability or downstream handling changes materially. Acceptance should describe the tested conditions, not an unrestricted capacity promise.

## Define the utility interfaces for your potato washing project

[Send our engineering team your potato washing project requirements](https://www.spudmate.com/#contact), including crop samples or sample availability, size range and soil condition, target hourly output, shift schedule, site layout with floor and drain elevations, measured water flow and pressure under concurrent demand, electrical supply details, wastewater destination, solids removal route and bagging requirements. Include your proposed acceptance criteria so we can review the configuration and site interfaces together.